DIEGO GUAYASAMIN ARQUITECTOS

ES / EN

Contact

Hospitality: three projects

3 in study.

Status as stated on the 2015 site, to be confirmed. Each plate's width follows the square root of the project's area.

Projects in study, 3

  1. Hotel and Convention Centre Project Manta

    Manta. In study.
  2. Hotel Bogotá

    Bogotá. In study.
  3. Hotel Project Lima

    Lima. In study.
  1. UNASUR General Secretary Headquarters

    San Antonio de Pichincha. Institutional. 20,000 m². Built

  2. QBE Colonial Insurance Company

    Quito. Corporate. 18,000 m². Built

  3. Guayasamin Museum House

    Cumbayá. Cultural. 1,800 m². Built

  4. Suyana Corporate Tower

    Quito. Corporate. 12,000 m². Built

  5. Cumbayá Residence

    Cumbayá. Residential. 900 m². Built